Implementation of Kashaka Safe Water Project

by fontes on 21/01/2010 No comments

After the assessment in November 2009 the water project in Kashaka was installed in January 2010. A surface water treatment plant was installed where the water which is withdrawn from Lake George, is first settled in a settlement tank, then passes through a sand filter and an activated carbon filter and then chlorinated. Two public stand posts were constructed where people can withdraw water nearby their homes.

fontesImplementation of Kashaka Safe Water Project

Related Posts

Take a look at these posts