After the assessment in November 2009 the water project in Kashaka was installed in January 2010. A surface water treatment plant was installed where the water which is withdrawn from Lake George, is first settled in a settlement tank, then passes through a sand filter and an activated carbon filter and then chlorinated. Two public stand posts were constructed where people can withdraw water nearby their homes.